Hes working cutting out the middle man.
Hes working cutting out the middle man.
he's saving u the time
is a layout bug....!!! or you put the mason on top of the deposit?
Actually, it appears after further investigation, that yes, I may have put a mason directly ontop of a stone deposit, BUT, this means I can have 1 more marble mason in that location, which is good, because I now have 4 close to the marble deposit.
I don't think that putting masons ontop of deposits should be possible, but it does no harm, in this case, it lets me have one more working near the marble deposit.