Description
The Gold Mine allows you to extract Gold Ore from Gold Deposits
Building Unlock Level
24
Building Costs
1,400 1,400 1,500
Building Licence Used
Yes
Tradable
No
Produce
Gold Ore
Production Time
12 Minutes 00 Seconds
Used Resource
Gold Deposit
Building Class
Advanced Building
Production For
Gold Smelter
Consumption For
Gold Deposit
Level Production
Upgrade Cost