Description
The Gold Smelter produces Gold from Gold Ore and Coal that can be passed on to the Coinage to make Coins
Building Unlock Level
24
Building Costs
2,0002,000
2,500
Building Licence Used
Yes
Tradable
No
Produce
Gold
Production Time
12 Minutes 00 Seconds
Used Resource
Gold Ore |
Coal
Building Class
Advanced Building
Production For
Coinage
Consumption For
Gold Mine | Coking Plant | Coal Mine
Level Production
Upgrade Cost
![]()