When a building is undergoing an upgrade, production stops. However this is not reflected in the production overview! I have three copper smelters, and the total production was 1316 for 12 hours. However this is incorrect, as one has stopped, and the true figure was 400 units lower!
This is a bit misleading, can it be addressed?
Thanks.